You must be a CTBUH Member to view this resource.
22 Chapel
Building
Completed
2021
Residential
74.2 m / 243 ft
20
1
180
87
12,373 m² / 133,182 ft²
Proposed
Construction Start
Completed
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
You must be a CTBUH Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The main contractor is the supervisory contractor of all construction work on a project, management of sub-contractors and vendors, etc. May be referred to as "Construction Manager," however, for consistency CTBUH uses the term "Main Contractor" exclusively.
02 December 2022
Work has reached completion on 22 Chapel Street, a 20-story residential building in Downtown Brooklyn. Designed by CetraRuddy and developed by Delshah Capital and OTL...
02 December 2022
Work has reached completion on 22 Chapel Street, a 20-story residential building in Downtown Brooklyn. Designed by CetraRuddy and developed by Delshah Capital and OTL...
17 November 2020
Construction has topped out at 22 Chapel Street, a 20-story residential building in Downtown Brooklyn. Designed by CetraRuddy and developed by Delshah Capital and OTL...
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.
View our privacy policy