You must be a CTBUH Member to view this resource.
Torres de Colón
Torres de Jerez, Heron
Building
Completed
1976
Office
All-Concrete
110 m / 361 ft
23
6
165
8
You must be a CTBUH Member to view this resource.
You must be a CTBUH Member to view this resource.
Construction Start
Completed
You must be a CTBUH Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The main contractor is the supervisory contractor of all construction work on a project, management of sub-contractors and vendors, etc. May be referred to as "Construction Manager," however, for consistency CTBUH uses the term "Main Contractor" exclusively.
16 September 2014 | Madrid
Traditionally much of the focus in the tall building sector has been centered on the ground breaking technology being put in place for the pioneering...
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.
View our privacy policy