Filter by
You must be a CTBUH Member to view this resource.
Castlereagh Centre
9 Castlereagh, Capita Centre
Building
Completed
1989
Office
All-Concrete
173 m / 568 ft
31
79
30,000 m² / 322,917 ft²
You must be a CTBUH Member to view this resource.
You must be a CTBUH Member to view this resource.
Construction Start
Completed
You must be a CTBUH Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The CTBUH lists a project manager when a specific firm has been commissioned to oversee this aspect of a tall building’s design/construction. When the project management efforts are handled by the developer, main contract, or architect, this field will be omitted.
Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).
7 March 2017 - Event
9 November 2008 - Event
9 March 2017
Executive Director Antony Wood delivered two well attended lectures in Sydney and Melbourne, organized by the respective local CTBUH committees.
15 November 2008
During his week in Australia Executive Director Antony Wood had a chance to visit many of the tall buildings, including Riverside Center, Aurora Place, and Governor Philip Tower.
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.
View our privacy policy