3995
Global
Height rank

The Hansar

Bangkok
Height
1
To Tip:
Height is measured from the level of the lowest, significant, open-air, pedestrian entrance to the highest point of the building, irrespective of material or function of the highest element (i.e., including antennae, flagpoles, signage and other functional-technical equipment).
173 m / 567 ft
2
Architectural:
Height is measured from the level of the lowest, significant, open-air, pedestrian entrance to the architectural top of the building, including spires, but not including antennae, signage, flag poles or other functional-technical equipment. This measurement is the most widely utilized and is employed to define the Council on Tall Buildings and Urban Habitat (CTBUH) rankings of the "World's Tallest Buildings."
173 m / 567 ft
3
Occupied:
Height is measured from the level of the lowest, significant, open-air, pedestrian entrance to the highest occupied floor within the building.
149.3 m / 490 ft
1 2 3 The Hansar
  Floors
Above Ground
The number of floors above ground should include the ground floor level and be the number of main floors above ground, including any significant mezzanine floors and major mechanical plant floors. Mechanical mezzanines should not be included if they have a significantly smaller floor area than the major floors below. Similarly, mechanical penthouses or plant rooms protruding above the general roof area should not be counted. Note: CTBUH floor counts may differ from published accounts, as it is common in some regions of the world for certain floor levels not to be included (e.g., the level 4, 14, 24, etc. in Hong Kong).
43
Height 173 m / 567 ft
Floors 43
Official Name
The current legal building name.

The Hansar

Other Names
Other names the building has commonly been known as, including former names, common informal names, local names, etc.

Hansar Rajdamri, Ativa Hotel Bangkok

Type
CTBUH collects data on two major types of tall structures: 'Buildings' and 'Telecommunications / Observation Towers.' A 'Building' is a structure where at least 50% of the height is occupied by usable floor area. A 'Telecommunications / Observation Tower' is a structure where less than 50% of the structure's height is occupied by usable floor area. Only 'Buildings' are eligible for the CTBUH 'Tallest Buildings' lists.

Building

Status
Completed
Architecturally Topped Out
Structurally Topped Out
Under Construction
Proposed
On Hold
Never Completed
Vision
Competition Entry
Canceled
Proposed Renovation
Under Renovation
Renovated
Under Demolition
Demolished

Completed

Completion

2011

Country
The CTBUH follows the United Nations's definition of Country, and thus uses the lists and codes established by that organization.

Thailand

City
The CTBUH follows the United Nations's definition of City, and thus uses the lists and codes established by that organization.

Bangkok

Address

3 Rajdamri Road

Function
A single-function tall building is defined as one where 85% or more of its usable floor area is dedicated to a single usage. Thus a building with 90% office floor area would be said to be an "office" building, irrespective of other minor functions it may also contain.

A mixed-use tall building contains two or more functions (or uses), where each of the functions occupy a significant proportion of the tower's total space. Support areas such as car parks and mechanical plant space do not constitute mixed-use functions. Functions are denoted on CTBUH "Tallest Building" lists in descending order, e.g., "hotel/office" indicates hotel function above office function.

Hotel / Residential

Structural Material
All-Steel
Both the main vertical/lateral structural elements and the floor spanning systems are constructed from steel. Note that a building of steel construction with a floor system of concrete planks or concrete slab on top of steel beams is still considered an “all-steel” structure as the concrete elements are not acting as the primary structure.

All-Concrete
Both the main vertical/lateral structural elements and the floor spanning systems are constructed from concrete which has been cast in place and utilizes steel reinforcement bars and/or steel reinforced concrete which has been precast as individual components and assembled together on-site.

All-Timber
Both the main vertical/lateral structural elements and the floor spanning systems are constructed from timber. An all-timber structure may include the use of localized non-timber connections between timber elements. Note that a building of timber construction with a floor system of concrete planks or concrete slab on top of timber beams is still considered an “all-timber” structure as the concrete elements are not acting as the primary structure.

Mixed-Structure
Utilizes distinct systems (e.g. all-steel, all-concrete, all-timber), one on top of the other. For example, a Steel Over Concrete indicates an all-steel structural system located on top of an all-concrete structural system, with the opposite true of Concrete Over Steel.

Composite
A combination of materials (e.g. steel, concrete, timber) are used together in the main structural elements. Examples include buildings which utilize: steel columns with a floor system of reinforced concrete beams; a steel frame system with a concrete core; concrete-encased steel columns; concrete-filled steel tubes; etc. Where known, the CTBUH database breaks out the materials used within a composite building’s primary structural elements.

All-Concrete

Official Website

Hansar Rajdamri

Height
Architectural
Height is measured from the level of the lowest, significant, open-air, pedestrian entrance to the architectural top of the building, including spires, but not including antennae, signage, flag poles or other functional-technical equipment. This measurement is the most widely utilized and is employed to define the Council on Tall Buildings and Urban Habitat (CTBUH) rankings of the "World's Tallest Buildings."

173 m / 567 ft

To Tip
Height is measured from the level of the lowest, significant, open-air, pedestrian entrance to the highest point of the building, irrespective of material or function of the highest element (i.e., including antennae, flagpoles, signage and other functional-technical equipment).
173 m / 567 ft
Occupied
Height is measured from the level of the lowest, significant, open-air, pedestrian entrance to the highest occupied floor within the building.
149.3 m / 490 ft
Floors Above Ground
The number of floors above ground should include the ground floor level and be the number of main floors above ground, including any significant mezzanine floors and major mechanical plant floors. Mechanical mezzanines should not be included if they have a significantly smaller floor area than the major floors below. Similarly, mechanical penthouses or plant rooms protruding above the general roof area should not be counted. Note: CTBUH floor counts may differ from published accounts, as it is common in some regions of the world for certain floor levels not to be included (e.g., the level 4, 14, 24, etc. in Hong Kong).

43

# of Apartments
Number of Apartments refers to the total number of residential units (including both rental units and condominiums) contained within a particular building.

196

# of Hotel Rooms
Number of Hotel Rooms refers to the total number of hotel rooms contained within a particular building.

80

# of Parking Spaces
Number of Parking Spaces refers to the total number of car parking spaces contained within a particular building.

298

# of Elevators
Number of Elevators refers to the total number of elevator cars (not shafts) contained within a particular building (including public, private and freight elevators).

11

Top Elevator Speed
Top Elevator Speed refers to the top speed capable of being achieved by an elevator within a particular building, measured in meters per second.

3.5 m/s

Tower GFA
Tower GFA refers to the total gross floor area within the tower footprint, not including adjoining podiums, connected buildings or other towers within the development.

46,167 m² / 496,937 ft²

Rankings

#
3995
Tallest in the World
#
79
Tallest in Thailand
#
69
Tallest in Bangkok

Construction Schedule

2005

Proposed

2006

Construction Start

2011

Completed

Architect
Design

Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.

Architect of Record

Usually takes on the balance of the architectural effort not executed by the "Design Architect," typically responsible for the construction documents, conforming to local codes, etc. May often be referred to as "Executive," "Associate," or "Local" Architect, however, for consistency CTBUH uses the term "Architect of Record" exclusively.

Structural Engineer
Design

The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.

MEP Engineer
Design

The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.

Material Supplier

Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).

Elevator
Owner
Somhansar company Limited
Developer
Ativa Hospitality Corp., Ltd.
Architect
Design

Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.

Architect of Record

Usually takes on the balance of the architectural effort not executed by the "Design Architect," typically responsible for the construction documents, conforming to local codes, etc. May often be referred to as "Executive," "Associate," or "Local" Architect, however, for consistency CTBUH uses the term "Architect of Record" exclusively.

Structural Engineer
Design

The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.

MEP Engineer
Design

The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.

Project Manager

The CTBUH lists a project manager when a specific firm has been commissioned to oversee this aspect of a tall building’s design/construction. When the project management efforts are handled by the developer, main contract, or architect, this field will be omitted.

EMS Consultants Company
Contractor
Main Contractor

The main contractor is the supervisory contractor of all construction work on a project, management of sub-contractors and vendors, etc. May be referred to as "Construction Manager," however, for consistency CTBUH uses the term "Main Contractor" exclusively.

Ritta Co. Ltd.
Material Supplier

Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).

Elevator

CTBUH Awards & Distinctions

Best Tall Building, by Region, Asia & Australasia 2011 Award of Excellence

2011 CTBUH Awards

 

Videos

18 September 2014 | Bangkok

Interview: Mun Summ Wong

Mun Summ Wong of WOHA Architects is interviewed by Chris Bentley during the 2014 CTBUH Shanghai Conference at the Jin Mao Tower. Mun Summ talks...

Research

16 January 2012

Case Study: The Hansar, Bangkok

Mun Summ Wong & Richard Hassell, WOHA

High-rise, high-density living has been embraced as a positive housing solution for many millions of people living in Asia’s growing urban metropolises. The Hansar, a...

 

About The Hansar

The Hansar is located in the heart of Bangkok, surrounded by luxury hotels, shopping areas, and a large city park. The site is small and irregular, with a building plot ratio of 1:10. The design captures the value of the site by maximizing the building area. In Bangkok, living up high provides less noise, less dust, cooler breezes and privacy with full exposure to views. The small site limited the potential green areas on the ground level so sky gardens were introduced at height and are equal to 30% of the site area. These sky gardens are placed at every fifth floor, and are staggered across both the east and west elevations. Each unit has either a private lift lobby with an entry to the sky garden or a living room with sky garden views.

To negotiate between the desire for views and the need to provide shading, a metal mesh screen was utilized. These sun screens also serve as privacy screens for the units. The expanded mesh, which forms the building’s outer skin, is coated in a metallic bronze color to create a contrast to the usually grey Bangkok sky. The bronze screen, when combined with the sky gardens, gives a unique character to the development. The golden mesh and floating greenery allude to the glimpses of gilded temple and luxuriant gardens that hide amongst the concrete jungle of Bangkok.

Tropical living is all about the interaction between the interior and exterior, but in a dense urban site this is challenging. The design looked at ways of creating this tropical lifestyle in a high-density, high-rise development. Landscaping is incorporated in all the common areas throughout the building. Lower level units have private cantilevered gardens. These gardens create a rhythm of green elements which run vertically throughout the whole development. Sky gardens, sky pavilions and green walls have been created all the way up the building to increase the landscape area and interaction between interior and exterior. At the hotel, cantilevered sky pavilions project from the rooms. These are topped with sky gardens, which can be enjoyed by the nearby rooms. Internal light wells are planted with green walls, and give private garden views to every hotel room. The condominium apartments and hotel rooms are all accessed off naturally ventilated and naturally lit corridors, reducing the energy use of the building substantially.

At the podium the ground level consists of retail below six stories of above-ground parking (due to frequent flooding, underground parking is not a good option in Bangkok). Green creeper screens wrap around the car park podium, on top of which sits the cantilevered swimming pool.

CTBUH Awards & Distinctions

Best Tall Building, by Region, Asia & Australasia 2011 Award of Excellence

2011 CTBUH Awards

18 September 2014 | Bangkok

Interview: Mun Summ Wong

Mun Summ Wong of WOHA Architects is interviewed by Chris Bentley during the 2014 CTBUH Shanghai Conference at the Jin Mao Tower. Mun Summ talks...

18 September 2014 | Bangkok

Monthly Video: Five Minutes with Mun Summ Wong

Mun Summ Wong of WOHA Architects is interviewed by Chris Bentley during the 2014 CTBUH Shanghai Conference at the Jin Mao Tower. Mun Summ talks...