Note: As this project is structurally topped out, the data is based on the most reliable information currently available. This data is thus subject to change until the building has completed and all information can be confirmed and ratified by the CTBUH.
You must be a CTBUH Member to view this resource.
FNB Financial Center
Building
Structurally Topped Out
2023
Office
composite
26
51,097 m² / 550,004 ft²
Construction Start
Completed
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
You must be a CTBUH Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
14 October 2020
The Penguins say they have the last piece of financing needed to redevelop the former site of the Civic Arena. Clay Cove is investing in...