You must be a CTBUH Member to view this resource.
Krystal Tower
Logik I
Building
Never Completed
Residential
All-Concrete
34
153
You must be a CTBUH Member to view this resource.
16 February 2015 - Event
The concrete structure of Krystal Tower reached the fifth floor before construction stalled. The site was later acquired and incorporated into the the plans for HUB Miami, with the unfinished concrete structure demolished in 2024.
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.
View our privacy policy