You must be a CTBUH Member to view this resource.
Panorama
Sélection Panorama
Building
Completed
2019
Residential
All-Concrete
106 m / 348 ft
31
286
37,471 m² / 403,334 ft²
You must be a CTBUH Member to view this resource.
You must be a CTBUH Member to view this resource.
Construction Start
Completed
You must be a CTBUH Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).
21 August 2019
A new development by ACDF Architecture known as Panorama has been unveiled. The 30-story retirement complex is to be located on the banks of the...
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.
View our privacy policy