You must be a CTBUH Member to view this resource.
Paramount Tower
Building
Completed
1998
Residential
All-Concrete
172.8 m / 567 ft
51
464
9
3.56 m/s
58,020 m² / 624,522 ft²
You must be a CTBUH Member to view this resource.
You must be a CTBUH Member to view this resource.
You must be a CTBUH Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The Engineer of Record takes the balance of the engineering effort not executed by the “Design Engineer,” typically responsible for construction documents, conforming to local codes, etc.
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.
View our privacy policy