You must be a CTBUH Member to view this resource.
St. Pancras Renaissance London Hotel
Midland Grand Hotel, St Pancras Chambers
Building
Completed
1873
Residential / Hotel
All-Masonry
82 m / 269 ft
9
67
245
Proposed
Completed
Retrofit Start
Retrofit End
You must be a CTBUH Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).
01 March 2020
Gerard Peet, Rotterdam University of Applied Sciences Nederlands
Skyscrapers are often seen as a typically American phenomenon. This paper aims at demonstrating that in terms of technology major developments are European and that,...
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.
View our privacy policy