Fly Service Engineering S.r.I.

Buildings

Note: All listed data for proposed or under construction buildings is based on the most reliable information currently available. This data is thus subject to change until the building has completed and all information can be confirmed and ratified by the CTBUH.

  Completed   Architecturally Topped Out   Structurally Topped Out   Under Construction   On Hold   Never Completed   Proposed   Vision   Demolished
ID #   Status Building Name City Height (m) Height (ft) Floors Completion Material Use
16524 1   COM Morpheus Macau (CN) 155.2 509 40 2018 hotel / casino