Arcelor

Visit the ArcelorMittal Member Page
for integrated resources

ArcelorMittal is a member of the CTBUH at the Contributor level.

Visit the CTBUH Membership section to find out more about ways of supporting the Council and the benefits of doing so.

Acquired by ArcelorMittal (2006)

Arcelor

Acquired Aceralia (2002)
Acquired Arbed (2002)
Acquired Usinor (2002)

Click a company above to see buildings specifically involving that company.

Buildings

Note: All listed data for proposed or under construction buildings is based on the most reliable information currently available. This data is thus subject to change until the building has completed and all information can be confirmed and ratified by the CTBUH.

  Completed   Architecturally Topped Out   Structurally Topped Out   Under Construction   On Hold   Never Completed   Proposed   Vision   Demolished
ID #   Status Building Name City Height (m) Height (ft) Floors Completion Material Use
688 1   COM 21st Century Tower Dubai (AE) 269 883 55 2003 steel/concrete residential
877 2   COM Chelsea Tower Dubai (AE) 250 820 49 2005 concrete residential / hotel
1528 3   COM 111 South Wacker Chicago (US) 207.6 681 51 2005 composite office
3168 4   COM SX Stage 1 Melbourne (AU) 163 535 40 2005 composite office