OLYMPIQUE Facade Access Consulting

Visit the OLYMPIQUE Facade Access Consulting Member Page
for integrated resources

OLYMPIQUE Facade Access Consulting is a member of the CTBUH at the Contributor level.

Visit the CTBUH Membership section to find out more about ways of supporting the Council and the benefits of doing so.

Buildings

Note: All listed data for proposed or under construction buildings is based on the most reliable information currently available. This data is thus subject to change until the building has completed and all information can be confirmed and ratified by the CTBUH.

  Completed   Architecturally Topped Out   Structurally Topped Out   Under Construction   On Hold   Never Completed   Proposed   Vision   Demolished
ID #   Status Building Name City Height (m) Height (ft) Floors Completion Material Use
1381 1   COM River Point Chicago (US) 223 732 52 2017 composite office
16984 2   COM 1144 Fifteenth Denver (US) 183.6 602 42 2018 steel/concrete office
2576 3   COM Century Plaza Tower I Los Angeles (US) 174 571 44 1975 office
2577 3   COM Century Plaza Tower II Los Angeles (US) 174 571 44 1975 office
3860 5   COM One America Plaza San Diego (US) 152.4 500 34 1991 steel office
3893 6   COM Manchester Grand Hyatt Hotel San Diego (US) 151.5 497 40 1992 concrete hotel
9925 7   COM Manchester Grand Hyatt Seaport San Diego (US) 135.9 446 34 2003 steel hotel
20515 8   COM San Diego Marriott Marquis & Marina Tower 1 San Diego (US) 110 361 25 1984 steel hotel
20514 8   COM San Diego Marriott Marquis & Marina Tower 2 San Diego (US) 110 361 25 1987 steel hotel
24690 10   COM BRIC Phase 1 San Diego (US) 52.7 173 17 2016 concrete hotel