Curtain Wall Design and Consulting, Inc.

CDC Curtain Wall Design & Consulting

CDC Curtain Wall Design & Consulting is a member of the CTBUH at the Participant level.

Visit the CTBUH Membership section to find out more about ways of supporting the Council and the benefits of doing so.

Buildings

Note: All listed data for proposed or under construction buildings is based on the most reliable information currently available. This data is thus subject to change until the building has completed and all information can be confirmed and ratified by the CTBUH.

  Completed   Architecturally Topped Out   Structurally Topped Out   Under Construction   On Hold   Never Completed   Proposed   Vision   Demolished
ID #   Status Building Name City Height (m) Height (ft) Floors Completed Material Use
84 1   COM Makkah Royal Clock Tower Mecca (SA) 601 1,972 120 2012 steel/concrete other / hotel
15530 2   COM 609 Main at Texas Houston (US) 230.1 755 48 2017 concrete office
16984 3   COM 1144 Fifteenth Denver (US) 188 617 40 2018 steel/concrete office / retail
25617 4   COM Torre Sofia San Pedro Garza García (MX) 158 518 40 2014 office / residential
12629 5   COM Three Nationwide Plaza Columbus (US) 124.4 408 26 1988 steel office
15304 6   COM United States Federal Courthouse Seattle (US) 118.9 390 21 2004 steel office / government
17728 7   COM Wynn Palace Macau (CN) 115 377 29 2016 hotel
32598 8   COM Equus 333 Torre 1 San Pedro Garza García (MX) 112.1 368 24 2016 concrete office
32216 8   COM Equus 333 Torre 2 San Pedro Garza García (MX) 112.1 368 24 2016 concrete office
32599 10   COM Equus 333 Torre 3 San Pedro Garza García (MX) 96.3 316 24 2016 concrete residential
26468 11   COM 22 West Washington Chicago (US) 84.1 276 17 2008 composite office