Fili Grad Complex Download PDF

Facts & Figures

Official Name Fili Grad
Status Completed
Country Russia
City Moscow
Complex Function office / residential / retail
Proposed 2012
Construction Start 2013
Completion 2016
# of Apartments 2,472
# of Parking Spaces 12,018

Buildings in Complex

  Completed   Architecturally Topped Out   Structurally Topped Out   Under Construction   On Hold   Never Completed   Proposed   Vision   Demolished
ID #   Status Building Name City Height (m) Height (ft) Floors Completion Material Use
17311 1   COM Fili Grad - Phase 1-1B Moscow (RU) 108.6 356 31 2016 concrete residential / retail
20239 2   COM Fili Grad - Phase 1-1A Moscow (RU) 98.7 324 28 2016 concrete residential
20243 3   COM Fili Grad - Phase 2-2 Moscow (RU) 86.3 283 24 2017 concrete residential
20244 3   COM Fili Grad - Phase 2-3 Moscow (RU) 86.3 283 24 2017 concrete residential
20245 3   COM Fili Grad - Phase 2-4 Moscow (RU) 86.3 283 24 2017 concrete residential
20246 3   COM Fili Grad - Phase 2-5 Moscow (RU) 86.3 283 24 2017 concrete residential
20247 3   COM Fili Grad - Phase 2-6 Moscow (RU) 86.3 283 24 2017 concrete residential
20242 8   COM Fili Grad - Phase 2-1 Moscow (RU) 75.5 248 21 2017 concrete office
20248 8   COM Fili Grad - Phase 2-7 Moscow (RU) 75.5 248 21 2017 concrete office
20241 10   COM Fili Grad - Phase 1-3 Moscow (RU) 74.8 245 21 2016 concrete residential
20240 11   COM Fili Grad - Phase 1-2 Moscow (RU) 74.6 245 21 2016 concrete residential