text
Buildings | CTBUH Skyscraper Center
Buildings by Hill International

 Completed    Topped Out    Under Construction    On Hold    Never Completed    Proposed    Vision    Demolished  

#

Building Name

City

Height (m)

Height (ft)

Floors

Completed

Material

Use
-.2 ADNOC Headquarters   Abu Dhabi (AE)   342  1122  76    2014  concrete   office
1.1 Etihad Towers T2   Abu Dhabi (AE)   305  1002  80    2011  concrete   residential
2.1 Etihad Towers T1   Abu Dhabi (AE)   278  911  69    2011  concrete   hotel / residential
3.1 Nation Towers Residential Lofts   Abu Dhabi (AE)   268  879  64    2012  concrete   residential
4.1 Etihad Towers T3   Abu Dhabi (AE)   260  854  60    2011  concrete   office
5.1 Palm Tower 1   Doha (QA)   244  802  58    2011  composite   office
5.1 Palm Tower 2   Doha (QA)   244  802  58    2011  composite   office
7.1 The Gate Residential Tower 1   Abu Dhabi (AE)   238  781  66    2013  concrete   residential
7.1 The Gate Residential Tower 2   Abu Dhabi (AE)   238  781  66    2013  concrete   residential
7.1 The Gate Residential Tower 3   Abu Dhabi (AE)   238  781  66    2013  concrete   residential
10.1 Etihad Towers T4   Abu Dhabi (AE)   234  768  66    2011  concrete   residential
11.1 St. Regis Luxury Hotel   Abu Dhabi (AE)   233  765  51    2013  concrete   hotel / office
12.1 InterContinental Hotel West Bay   Doha (QA)   220  722  59    2012  concrete   residential / hotel
13.1 Etihad Towers T5   Abu Dhabi (AE)   218  714  61    2011  concrete   residential
-.3 Al Rajhi Bank Tower   Riyadh (SA)   205  673  36    2016     office
14.1 Złota 44   Warsaw (PL)   192  630  54    2013  concrete   residential
-.4 Swiss Deluxe Grand Hotel   Doha (QA)   -  -  69    -  concrete   residential / hotel
-.3 Saraya Tower 1   Abu Dhabi (AE)   -  -  51    2014  concrete   residential
-.3 Saraya Tower 2   Abu Dhabi (AE)   -  -  45    2014  concrete   residential