text
Buildings | CTBUH Skyscraper Center
Buildings by Shree Ram Urban Infrastructure

Status   Completed  Topped out  Construction  Constr. Stopped  Proposed  Vision  Demolished 

#

Building Name

City

Height (m)

Height (ft)

Floors

Completed

Material

Use
-.3 Palais Royale   Mumbai (IN)   320  1050  88   2014  concrete   residential