text
Buildings | CTBUH Skyscraper Center
Buildings by Batumi City Hall

Status   Completed  Topped out  Construction  Constr. Stopped  Proposed  Vision  Demolished 

#

Building Name

City

Height (m)

Height (ft)

Floors

Completed

Material

Use
1. Alphabetic Tower   Batumi (GE)   130  427  5   2012  steel   panoramatower