Filter by
You must be a CTBUH Member to view this resource.
One Meridian Plaza
Meridian Bank Building
Building
Demolished
1972
Office
All-Steel
150 m / 492 ft
38
Completed
Demolished
You must be a CTBUH Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
4 June 2018 - CTBUH Research
5 November 2014 - Event
27 April 2018
CTBUH Research
Although the world has more than 1,300 buildings of 200 meters or higher, no tall building of more than 187 meters has been demolished, with...
27 April 2018
CTBUH Research
Although the world has more than 1,300 buildings of 200 meters or higher, no tall building of more than 187 meters has been demolished, with...
01 May 2008
Daniel J. O’Connor P.E., Schirmer Engineering Corporation
This paper discusses the code provisions and current test standards applicable to perimeter fire barrier systems, which may jeopardize architects’ creative designs in the near...
4 June 2018
Following the planned demolition of 270 Park Avenue, the Council has conducted a research study on the Top 10 Tallest Buildings Demolished so far.
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.
View our privacy policy