167 North Green
170 North Halsted, 801 West Lake Street
Building
Completed
2021
Office
Composite
LEED Gold BD+C: Core and Shell targeted
88.4 m / 290 ft
17
12
17,837 m² / 191,996 ft²
Proposed
Construction Start
Completed
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).
You must be a CTBUH Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).
Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).
15 March 2022
The company that makes White Claw and billionaire Lukas Walton's philanthropic and investment venture have leased new Fulton Market District offices, helping fill the remaining...
15 March 2022
The company that makes White Claw and billionaire Lukas Walton's philanthropic and investment venture have leased new Fulton Market District offices, helping fill the remaining...
05 November 2021
Smaller floor plates in office buildings are becoming more popular for cities, like Chicago, post-COVID. For the last decade, buildings with larger floor plates have...
14 March 2019
Chicago’s City Council has approved multiple new projects that are set to change the face of the skyline. Sterling Bay’s Lincoln Yards was approved by...
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.
View our privacy policy