201 Aleste

Curridabat
  • Facts
  • Login

    You must be a CTBUH Member to view this resource.

    Metrics
Height 33.1 m / 109 ft
Floors 7
Official Name
The current legal building name.

201 Aleste

Name of Complex
A complex is a group of buildings which are designed and built as pieces of a greater development.

Aleste

Type
CTBUH collects data on two major types of tall structures: 'Buildings' and 'Telecommunications / Observation Towers.' A 'Building' is a structure where at least 50% of the height is occupied by usable floor area. A 'Telecommunications / Observation Tower' is a structure where less than 50% of the structure's height is occupied by usable floor area. Only 'Buildings' are eligible for the CTBUH 'Tallest Buildings' lists.

Building

Status
Completed
Architecturally Topped Out
Structurally Topped Out
Under Construction
Proposed
On Hold
Never Completed
Vision
Competition Entry
Canceled
Proposed Renovation
Under Renovation
Renovated
Under Demolition
Demolished

Completed

Completion

2022

Country
The CTBUH follows the United Nations's definition of Country, and thus uses the lists and codes established by that organization.

Costa Rica

City
The CTBUH follows the United Nations's definition of City, and thus uses the lists and codes established by that organization.

Curridabat

Address

D032A

Function
A single-function tall building is defined as one where 85% or more of its usable floor area is dedicated to a single usage. Thus a building with 90% office floor area would be said to be an "office" building, irrespective of other minor functions it may also contain.

A mixed-use tall building contains two or more functions (or uses), where each of the functions occupy a significant proportion of the tower's total space. Support areas such as car parks and mechanical plant space do not constitute mixed-use functions. Functions are denoted on CTBUH "Tallest Building" lists in descending order, e.g., "hotel/office" indicates hotel function above office function.

Office

Energy Label

LEED Gold BD+C: Core and Shell

Height
Architectural
Height is measured from the level of the lowest, significant, open-air, pedestrian entrance to the architectural top of the building, including spires, but not including antennae, signage, flag poles or other functional-technical equipment. This measurement is the most widely utilized and is employed to define the Council on Tall Buildings and Urban Habitat (CTBUH) rankings of the "World's Tallest Buildings."

33.1 m / 109 ft

To Tip
Height is measured from the level of the lowest, significant, open-air, pedestrian entrance to the highest point of the building, irrespective of material or function of the highest element (i.e., including antennae, flagpoles, signage and other functional-technical equipment).
33.1 m / 109 ft
Occupied
Height is measured from the level of the lowest, significant, open-air, pedestrian entrance to the highest occupied floor within the building.
23.5 m / 77 ft
Floors Above Ground
The number of floors above ground should include the ground floor level and be the number of main floors above ground, including any significant mezzanine floors and major mechanical plant floors. Mechanical mezzanines should not be included if they have a significantly smaller floor area than the major floors below. Similarly, mechanical penthouses or plant rooms protruding above the general roof area should not be counted. Note: CTBUH floor counts may differ from published accounts, as it is common in some regions of the world for certain floor levels not to be included (e.g., the level 4, 14, 24, etc. in Hong Kong).

7

Floors Below Ground
The number of floors below ground should include all major floors located below the ground floor level.

2

Tower GFA
Tower GFA refers to the total gross floor area within the tower footprint, not including adjoining podiums, connected buildings or other towers within the development.

16,664 m² / 179,370 ft²

Construction Schedule

2021

Construction Start

2022

Completed

Owner/Developer
Ab van der Wiel
Architect
Design

Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.

Studio Akkerhuis
Structural Engineer
Design

The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.

Pieters Bouwtechniek
MEP Engineer
Design

The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.

Burg Installatietechniek; LBP Sight
Contractor
Main Contractor

The main contractor is the supervisory contractor of all construction work on a project, management of sub-contractors and vendors, etc. May be referred to as "Construction Manager," however, for consistency CTBUH uses the term "Main Contractor" exclusively.

Ab van der Wiel
Mechanical
Burg Installatietechniek
Other Consultant

Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).

Landscape
Lola Landscape Architects; Piet Oudolf

About 201 Aleste

The 67-hectare mixed-use project emphasizes community engagement, economic empowerment, and environmental sustainability. Key initiatives include the "Verano en el Parque" program, Entrepreneurship School workshops, and the Aleste Market. Efforts involved planting 365 plants and it creating a walkable, inclusive, and green city, which integrates residential, commercial, and corporate spaces, with a focus on collaboration with local communities.