Note: As this project is under construction, the data is based on the most reliable information currently available. This data is thus subject to change until the building has completed and all information can be confirmed and ratified by the CTBUH.
2150 Keith Drive
2102 Keith Drive
Building
Under Construction
2025
Office
Timber Over Concrete
LEED Gold Targetted
45 m / 148 ft
10
15,096 m² / 162,492 ft²
Construction Start
Completed
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
You must be a CTBUH Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).
23 May 2022
CTBUH Research
This data study represents the significant recent momentum of the mass-timber movement worldwide. There are now 139 mass timber buildings around the world of eight...
2150 Keith Drive's design uses a perimeter braced structural system
that creates a striking expression of the building from the exterior
and eliminates the need for conventional cast-in-place concrete
cores. An innovative mass timber structure is proposed for all
floors above Level 2; a series of timber shear walls in the interior
and a series of structural braces at the exterior resist the wind and
seismic load.