You must be a CTBUH Member to view this resource.
425 Grand Concourse
Building
Completed
2022
Residential / Education / Hospital
All-Concrete
Passive House targeted
86.9 m / 285 ft
26
277
28,800 m² / 310,001 ft²
You must be a CTBUH Member to view this resource.
Proposed
Completed
You must be a CTBUH Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The main contractor is the supervisory contractor of all construction work on a project, management of sub-contractors and vendors, etc. May be referred to as "Construction Manager," however, for consistency CTBUH uses the term "Main Contractor" exclusively.
15 December 2021
Daniel Safarik, Council on Tall Buildings and Urban Habitat (CTBUH)
The tall building, the city, and by extension, urban life, are all facing unprecedented challenges, in multiple aspects—carbon, climate, and societal. The planet’s rapid urbanization...
15 July 2022
The 86.9-meter, 26-story mixed-use building in Mott Haven, Bronx in New York City has completed construction. Designed by Dattner Architects and developed by Trinity Financial...
15 July 2022
The 86.9-meter, 26-story mixed-use building in Mott Haven, Bronx in New York City has completed construction. Designed by Dattner Architects and developed by Trinity Financial...
21 July 2021
The 26-story apartment building at 425 Grand Concourse in the Bronx, which is 75 percent complete, is targeting Passive House designation. The project topped out...
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.
View our privacy policy