You must be a CTBUH Member to view this resource.
475 West 18th
Building
Canceled
Residential
All-Timber
36.6 m / 120 ft
10
15
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).
You must be a CTBUH Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).
22 June 2017 - Event
04 February 2016
Thomas Robinson, LEVER Architecture; Anyeley Hallova, project^; Jeff Spiritos, Spiritos Properties; Michelle Roelofs, Arup
In a continuing effort to support the Obama Administration’s climate strategy, the United States Department of Agriculture (USDA), in partnership with the Softwood Lumber Board...
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.
View our privacy policy