You must be a CTBUH Member to view this resource.
65 East Wacker Place
Millinery Mart Building, 65 East South Water Street
Building
Completed
1928
Residential
Office
All-Steel
93.9 m / 308 ft
25
255
20,996 m² / 225,999 ft²
Completed
Retrofit Start
You must be a CTBUH Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).
18 October 2022
N.Y.-based Intersection Realty Group Intersection paid US$19.3 million last month for a 25-story office building at 65 East Wacker Place, according to Cook County property...
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.
View our privacy policy