You must be a CTBUH Member to view this resource.
800 West Fulton Market
Building
Completed
2021
Office
Composite
LEED Platinum targeted
91.4 m / 300 ft
18
1
36
40,542 m² / 436,390 ft²
You must be a CTBUH Member to view this resource.
You must be a CTBUH Member to view this resource.
Proposed
Construction Start
Completed
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).
You must be a CTBUH Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).
Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).
25 March 2022
After its deal to lease a new office in the Fulton Market District fell through, social media app company Snap has set its sights on...
25 March 2022
After its deal to lease a new office in the Fulton Market District fell through, social media app company Snap has set its sights on...
24 November 2021
The maker of John Deere tractors has recently leased more than 38,000 square feet at 800 West Fulton Market in Chicago as it expands its...
14 March 2019
Chicago’s City Council has approved multiple new projects that are set to change the face of the skyline. Sterling Bay’s Lincoln Yards was approved by...
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.
View our privacy policy