You must be a CTBUH Member to view this resource.
ASEM Tower
Korea World Trade Center Annex
Building
Completed
1992
Office
176.5 m / 579 ft
42
4
31
91,315 m² / 982,906 ft²
You must be a CTBUH Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
You must be a CTBUH Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
10 October 2004
Si-Hwa Bae, Kyungwon College; Sung-Moon Jung, Samoo Architects & Engineers
This study aims at finding the direction for improving the office space through the research on the working features and satisfaction of the workers by...
10 October 2004
Si-Hwa Bae, Kyungwon College; Sung-Moon Jung, Samoo Architects & Engineers
This study aims at finding the direction for improving the office space through the research on the working features and satisfaction of the workers by...
10 October 2004
Ki-In Kim, HanmiParsons
The construction of high-rise buildings in Korea started in the early 1980s. However, considering the fact that the buildings practically appeared in the late 1990s...
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.
View our privacy policyWe are identifying potential improvements to the CTBUH Skyscraper Center database. The first step of this research is to understand the users of the database and what they are looking for. Please take a couple moments to share your feedback.
* Required