Avenue South Residence Block 13
Building
Completed
2023
Residential
All-Concrete
191 m / 627 ft
56
3
You must be a CTBUH Member to view this resource.
You must be a CTBUH Member to view this resource.
Construction Start
Completed
Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).
Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).
You must be a CTBUH Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The main contractor is the supervisory contractor of all construction work on a project, management of sub-contractors and vendors, etc. May be referred to as "Construction Manager," however, for consistency CTBUH uses the term "Main Contractor" exclusively.
Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).
Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).
This project implements Prefabricated Prefinished Volumetric Construction (PPVC) coupled with Integrated Digital Delivery (IDD) and Design for Manufactured Assembly (DfMA) to enhance productivity, shorten construction timelines, and elevate built quality and workplace safety. At 191 meters, and built with over 3000 prefabricated modules, the building achieves approximately 40 percent productivity savings compared to conventional methods. This innovation in logistics and construction efficiency also integrates landscaped sky gardens within the high-rise, overcoming engineering challenges to ensure structural integrity and functionality.