You must be a CTBUH Member to view this resource.
AXA Tower
Singapore Treasury Building, Temasek Tower
Building
Demolished
1986
Office
Concrete-Steel Composite
234.7 m / 770 ft
52
5
667
22
130,063 m² / 1,399,986 ft²
Construction Start
Completed
Demolished
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
You must be a CTBUH Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
19 April 2007 - Event
07 May 2020
A consortium of investors led by Singapore-listed Perennial Real Estate Holdings announced on May 6 2020 that they are selling a 50 percent stake in...
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.
View our privacy policy