You must be a CTBUH Member to view this resource.
Bank Apartments
Building
Completed
2011
Residential
All-Concrete
129.7 m / 426 ft
41
358
251
4
7 m/s
32,639 m² / 351,323 ft²
You must be a CTBUH Member to view this resource.
You must be a CTBUH Member to view this resource.
Proposed
Construction Start
Completed
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
You must be a CTBUH Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The main contractor is the supervisory contractor of all construction work on a project, management of sub-contractors and vendors, etc. May be referred to as "Construction Manager," however, for consistency CTBUH uses the term "Main Contractor" exclusively.
Situated on a triangular plot in Melbourne’s Central Business District, the Bank Apartments take advantage of the unique site and context. An original, two-story historical bank building (designed by an honored Australian architect, William Godfrey) was located on the corner of the plot, which was preserved and incorporated into the design of the podium.
This luxury rental and condominium building has a variety of amenities serving its occupants, including a 25 meter swimming pool, roof deck, sauna, lounge, business center, meeting rooms, and a shared car service. To reach a Six Star energy efficiency rating in the NABERS rating system, the tower implemented sustainable solutions and took advantage of its north-facing site. Rainwater collection tanks serve the pool and irrigation systems.
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.
View our privacy policy