Brillia Tower Maebashi
Building
Under Construction
2024
Residential
Concrete-Steel Composite
93.2 m / 306 ft
27
1
203
28,991 m² / 312,057 ft²
Proposed
Construction Start
Completed
You must be a CTBUH Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The main contractor is the supervisory contractor of all construction work on a project, management of sub-contractors and vendors, etc. May be referred to as "Construction Manager," however, for consistency CTBUH uses the term "Main Contractor" exclusively.
11 May 2021
In Maebashi, a city in Japan’s Kantō region, a 27-story apartment tower is under construction. Brillia Tower Maebashi, situated near the train station, will provide...