Filter by
This project is a renovation and replaced Shell House
You must be a CTBUH Member to view this resource.
Brookfield Place Sydney
Ten Carrington Street, Wynyard Place, City One Tower
Building
Completed
2021
Office
All-Concrete
5.5 NABERS
133.2 m / 437 ft
34
3
81
33
6 m/s
70,450 m² / 758,317 ft²
You must be a CTBUH Member to view this resource.
You must be a CTBUH Member to view this resource.
Proposed
Construction Start
Completed
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
Usually takes on the balance of the architectural effort not executed by the "Design Architect," typically responsible for the construction documents, conforming to local codes, etc. May often be referred to as "Executive," "Associate," or "Local" Architect, however, for consistency CTBUH uses the term "Architect of Record" exclusively.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The Engineer of Record takes the balance of the engineering effort not executed by the “Design Engineer,” typically responsible for construction documents, conforming to local codes, etc.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The CTBUH lists a project manager when a specific firm has been commissioned to oversee this aspect of a tall building’s design/construction. When the project management efforts are handled by the developer, main contract, or architect, this field will be omitted.
The main contractor is the supervisory contractor of all construction work on a project, management of sub-contractors and vendors, etc. May be referred to as "Construction Manager," however, for consistency CTBUH uses the term "Main Contractor" exclusively.
Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).
These are firms that consult on the design of a building's façade. May often be referred to as "Cladding," "Envelope," "Exterior Wall," or "Curtain Wall" Consultant, however, for consistency CTBUH uses the term "Façade Consultant" exclusively.
Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).
You must be a CTBUH Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
Usually takes on the balance of the architectural effort not executed by the "Design Architect," typically responsible for the construction documents, conforming to local codes, etc. May often be referred to as "Executive," "Associate," or "Local" Architect, however, for consistency CTBUH uses the term "Architect of Record" exclusively.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The Engineer of Record takes the balance of the engineering effort not executed by the “Design Engineer,” typically responsible for construction documents, conforming to local codes, etc.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The CTBUH lists a project manager when a specific firm has been commissioned to oversee this aspect of a tall building’s design/construction. When the project management efforts are handled by the developer, main contract, or architect, this field will be omitted.
The main contractor is the supervisory contractor of all construction work on a project, management of sub-contractors and vendors, etc. May be referred to as "Construction Manager," however, for consistency CTBUH uses the term "Main Contractor" exclusively.
Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).
These are firms that consult on the design of a building's façade. May often be referred to as "Cladding," "Envelope," "Exterior Wall," or "Curtain Wall" Consultant, however, for consistency CTBUH uses the term "Façade Consultant" exclusively.
Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).
2022 CTBUH Awards
20 June 2017 - Conference Activity
17 August 2016 - Event
12 April 2018 | Sydney
Ken Shuttleworth, founding partner at Make, sat down with CTBUH to discuss Make's growing office in Sydney and the firm's role in the rapidly transforming...
30 October 2017
CTBUH 2017 Conference Speakers
The future of humanity on this planet relies on the collective benefits of urban density; reducing both land consumption and the energy needed to construct...
25 August 2020
The centerpiece of Brookfield Properties’ AUD$2 billion (US$1.4 billion) project topped out 134 meters above the brand new transit hall for Wynyard train station. The...
12 April 2018 | Sydney
Ken Shuttleworth, founding partner at Make, sat down with CTBUH to discuss Make's growing office in Sydney and the firm's role in the rapidly transforming...
30 October 2017 | Sydney
Ken Shuttleworth of Make is interviewed by Chris Bentley during the 2017 CTBUH Australia Conference.
30 October 2017 | Sydney
Two projects, in Sydney and London respectively, are currently being designed and delivered for Brookfield. These schemes address different infrastructure challenges and community needs, but...
30 October 2017 | Sydney
Tall buildings often take more than they give back, frequently exacerbating local environmental conditions, overshadowing streets and public spaces, creating wind tunnels, and impacting the...
30 October 2017 | Sydney
As the global urban population continues to grow apace, so too does the need to address questions over density, affordability, and sustainability in the urban...
29 October 2017 | Sydney
Carl Schibrowski of Brookfield Property Partners Australia is interviewed by Chris Bentley during the 2017 CTBUH Australia Conference.
30 October 2017
CTBUH 2017 Conference Speakers
The future of humanity on this planet relies on the collective benefits of urban density; reducing both land consumption and the energy needed to construct...
30 October 2017
Helen Lochhead & Philip Oldfield, University of New South Wales
Since 2000, through the City of Sydney’s Competitive Design Policy (CDP), the quality of major projects in the city has been improved significantly, mediating the...
26 October 2015
Paul Scott, Make
There is no doubt more tall buildings are required to accommodate global population growth. However, the taller a building, the greater the disconnect between occupants...
20 June 2017
CTBUH is pleased to announce that Brookfield Properties has been confirmed as a Diamond Sponsor of the 2017 Conference.
17 August 2016
CTBUH Sydney held a collaborative event with UNSW Built Environment, welcoming British architect Ken Shuttleworth, founder of Make, to Australia.
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.
View our privacy policy