You must be a CTBUH Member to view this resource.
West Wharf, 37 West Street
Calyer Place, 37 West Street
Building
Completed
2021
Residential
All-Concrete
48 m / 157 ft
14
92
Construction Start
Completed
You must be a CTBUH Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).
28 July 2021
The 14-floor residential building on Calyer Place has architecturally topped out. Located at 37 West Street, it is part of a 92,903-square-meter (1 million-square-foot) waterfront...
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.
View our privacy policy