You must be a CTBUH Member to view this resource.
Cambridge Suites Hotel
Building
Completed
1990
Hotel
74.4 m / 244 ft
21
4
229
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
You must be a CTBUH Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
05 October 2022
The Cambridge Suites Hotel has long been a staple of Toronto's financial district and its long been a distinctive landmark as well, easily picked out from...
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.
View our privacy policy