Chaoyang Park Plaza 1
Building
Completed
2017
Office
All-Concrete
LEED Gold
129 m / 423 ft
27
4
223,009 m² / 2,400,449 ft²
You must be a CTBUH Member to view this resource.
You must be a CTBUH Member to view this resource.
Proposed
Construction Start
Completed
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).
These are firms that consult on the design of a building's façade. May often be referred to as "Cladding," "Envelope," "Exterior Wall," or "Curtain Wall" Consultant, however, for consistency CTBUH uses the term "Façade Consultant" exclusively.
Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).
You must be a CTBUH Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The main contractor is the supervisory contractor of all construction work on a project, management of sub-contractors and vendors, etc. May be referred to as "Construction Manager," however, for consistency CTBUH uses the term "Main Contractor" exclusively.
Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).
These are firms that consult on the design of a building's façade. May often be referred to as "Cladding," "Envelope," "Exterior Wall," or "Curtain Wall" Consultant, however, for consistency CTBUH uses the term "Façade Consultant" exclusively.
Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).
2018 CTBUH Awards
31 May 2018 | Beijing
Chaoyang Park Plaza is set on the edge of Beijing’s largest public park, and has been envisioned as an extension of the green space. The...
31 May 2018 | Beijing
Chaoyang Park Plaza is set on the edge of Beijing’s largest public park, and has been envisioned as an extension of the green space. The...
31 May 2018 | Beijing
Dixon Lu, Associate Partner of MAD Architects, is interviewed by Chris Bentley regarding the Best Tall Building Asia & Australasia – Award of Excellence Winner,...
18 October 2016 | Beijing
Yangsong Ma of MAD Architects is interviewed by Chris Bentley during the 2016 CTBUH China Conference. Yangsong discusses the importance of incorporating cultural and local...
18 October 2016 | Beijing
The issue of skyscraper form and expression being appropriate to cultural and social context is currently a hotly debated topic in China, as well as...