You must be a CTBUH Member to view this resource.
Circa Las Vegas
Circa Resort & Casino
Building
Completed
2020
Hotel / Casino
146.3 m / 480 ft
44
777
116,129 m² / 1,250,002 ft²
You must be a CTBUH Member to view this resource.
Proposed
Construction Start
Completed
Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).
You must be a CTBUH Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The CTBUH lists a project manager when a specific firm has been commissioned to oversee this aspect of a tall building’s design/construction. When the project management efforts are handled by the developer, main contract, or architect, this field will be omitted.
The main contractor is the supervisory contractor of all construction work on a project, management of sub-contractors and vendors, etc. May be referred to as "Construction Manager," however, for consistency CTBUH uses the term "Main Contractor" exclusively.
Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).
Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).
25 June 2020
Owners of The Circa Resort & Casino, which is currently under construction in downtown Las Vegas, announced via Facebook 22 June 2020 that it would...
25 June 2020
Owners of The Circa Resort & Casino, which is currently under construction in downtown Las Vegas, announced via Facebook 22 June 2020 that it would...
24 March 2020
With COVID-19 upending daily life in Las Vegas, at least one major real estate project has shelved construction work over the outbreak, and at least...
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.
View our privacy policy