Filter by
Note: As this project is architecturally topped out, the data is based on the most reliable information currently available. This data is thus subject to change until the building has completed and all information can be confirmed and ratified by the CTBUH.
You must be a CTBUH Member to view this resource.
Height is measured from the level of the lowest, significant, open-air, pedestrian entrance to the highest point of the building, irrespective of material or function of the highest element (i.e., including antennae, flagpoles, signage and other functional-technical equipment).
Height is measured from the level of the lowest, significant, open-air, pedestrian entrance to the architectural top of the building, including spires, but not including antennae, signage, flag poles or other functional-technical equipment. This measurement is the most widely utilized and is employed to define the Council on Tall Buildings and Urban Habitat (CTBUH) rankings of the "World's Tallest Buildings."
Height is measured from the level of the lowest, significant, open-air, pedestrian entrance to the highest occupied floor within the building.
The number of floors above ground should include the ground floor level and be the number of main floors above ground, including any significant mezzanine floors and major mechanical plant floors. Mechanical mezzanines should not be included if they have a significantly smaller floor area than the major floors below. Similarly, mechanical penthouses or plant rooms protruding above the general roof area should not be counted. Note: CTBUH floor counts may differ from published accounts, as it is common in some regions of the world for certain floor levels not to be included (e.g., the level 4, 14, 24, etc. in Hong Kong).
The number of floors below ground should include all major floors located below the ground floor level.
Salesforce Tower
182 George Street, 37-57 Pitt Street,Circular Quay Tower
Building
Architecturally Topped Out
2022
office
steel
263.1 m / 863 ft
58
4
86
68,853 m² / 741,128 ft²
Proposed
Construction Start
Completed
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).
These are firms that consult on the design of a building's façade. May often be referred to as "Cladding," "Envelope," "Exterior Wall," or "Curtain Wall" Consultant, however, for consistency CTBUH uses the term "Façade Consultant" exclusively.
Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).
You must be a CTBUH Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).
These are firms that consult on the design of a building's façade. May often be referred to as "Cladding," "Envelope," "Exterior Wall," or "Curtain Wall" Consultant, however, for consistency CTBUH uses the term "Façade Consultant" exclusively.
Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).
CTBUH Australia Design Excellence Series: Circular Quay Tower
26 March 2019 - Event
Lendlease Confirmed as Diamond Sponsor
11 July 2017 - Conference Activity
30 October 2017 | Sydney
Circular Quay Tower: Aligning Private and Public Outcomes
Circular Quay Tower is an exceptional example of the private and public sectors working together to transform an area, breathing new life into George Street...
30 October 2017
Connecting the City: People, Density & Infrastructure
CTBUH 2017 Conference Speakers
The future of humanity on this planet relies on the collective benefits of urban density; reducing both land consumption and the energy needed to construct...
09 May 2022
Tech Giant's Tower Tops Out in Sydney
Lendlease’s 58-story Salesforce Tower has topped out. The Foster and Partners-designed Sydney Place project at 180 George Street, Circular Quay has taken four years to reach...
30 October 2017 | Sydney
Circular Quay Tower: Aligning Private and Public Outcomes
Circular Quay Tower is an exceptional example of the private and public sectors working together to transform an area, breathing new life into George Street...
30 October 2017 | Sydney
Circular Quay Tower: The Next Tallest Office Building in Sydney
Circular Quay Tower will be the centerpiece of an urban regeneration precinct that will reshape Sydney’s iconic harbour area and central business district. Taking advantage...
30 October 2017 | Sydney
Interview: Ross Palmer & Gerard Evenden
Ross Palmer & Gerard Evenden of Foster + Partners are interviewed by Chris Bentley during the 2017 CTBUH Australia Conference.
09 May 2022
Tech Giant's Tower Tops Out in Sydney
Lendlease’s 58-story Salesforce Tower has topped out. The Foster and Partners-designed Sydney Place project at 180 George Street, Circular Quay has taken four years to reach...
10 October 2019
Tech Giant Becomes Tenant, Wins Naming Rights to New Sydney Tower
Sydney’s tallest building will be dubbed the “Salesforce Tower Sydney” after its newly-announced anchor tenant, with the US software giant taking up nearly 50 percent...
26 March 2019
Join the CTBUH Australia Chapter for their first event of the year, looking at the Design Excellence competition entries for Circular Quay Tower.
11 July 2017
CTBUH is pleased to announce that Lendlease has confirmed as a Diamond Sponsor and Networking Reception Host of the 2017 Conference.
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.
View our privacy policy