You must be a CTBUH Member to view this resource.
Finsbury Tower
Building
Completed
Office
All-Concrete
61 m / 200 ft
16
1
14,215 m² / 153,009 ft²
You must be a CTBUH Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).
08 April 2020
The Hylo mixed-use development under construction on the edge of the City of London provides an intriguing game of spot the difference. Walking around its...
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.
View our privacy policy