You must be a CTBUH Member to view this resource.
Galaxy SOHO 4
Building
Completed
2012
Office / Retail
63 m / 207 ft
14
3
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
You must be a CTBUH Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
17 October 2016
Patrik Schumacher, Zaha Hadid Architects
Density via high-rise structures remains a primary agenda in our era of urban concentration. It is crucial to understand the societal forces that drive concentration:...
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.
View our privacy policy