You must be a CTBUH Member to view this resource.
Grand Hyatt Hotel Guangzhou
Building
Completed
2008
Hotel
103.6 m / 340 ft
26
You must be a CTBUH Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
You must be a CTBUH Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
17 October 2016
Allan Chung, Gensler; Ivan Mutis, Illinois Institute of Technology
There is a recent trend in the construction industry to implement “lean concepts,” a management strategy based upon the Toyota Production System philosophy. While the...
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.
View our privacy policy