You must be a CTBUH Member to view this resource.
Great Eagle Centre
Building
Completed
1983
Office
146 m / 479 ft
35
You must be a CTBUH Member to view this resource.
Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).
You must be a CTBUH Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).
16 September 2014 | Hong Kong
Traditionally much of the focus in the tall building sector has been centered on the ground breaking technology being put in place for the pioneering...
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.
View our privacy policy