Note: As this project is under construction, the data is based on the most reliable information currently available. This data is thus subject to change until the building has completed and all information can be confirmed and ratified by the CTBUH.
You must be a CTBUH Member to view this resource.
Green Energy Superblock Oasis Central Sudirman Tower 1
Oasis Central Sudirman Tower 1, Taspen Menara 1
Building
Under Construction
2028
Residential
276 m / 906 ft
65
3
Proposed
Construction Start
Completed
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
You must be a CTBUH Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
16 May 2023
Yanko Apostolov
Cities located along the equator are growing rapidly, but their hot, humid and rainy climates present a challenge for designers. How can we deliver high-quality,...
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.
View our privacy policy