You must be a CTBUH Member to view this resource.
Kajima Corporation Head Office Building No. 2
Building
Demolished
1972
Office
All-Steel
76.3 m / 250 ft
20
3
6
16,171 m² / 174,063 ft²
Completed
Demolished
You must be a CTBUH Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The CTBUH lists a project manager when a specific firm has been commissioned to oversee this aspect of a tall building’s design/construction. When the project management efforts are handled by the developer, main contract, or architect, this field will be omitted.
The main contractor is the supervisory contractor of all construction work on a project, management of sub-contractors and vendors, etc. May be referred to as "Construction Manager," however, for consistency CTBUH uses the term "Main Contractor" exclusively.
2012 CTBUH Awards
01 November 2011
Ryo Mizutani & Shigeru Yoshikai, Kajima Corporation
“Using conventional demolition methods, ten different materials could have been recycled on the job site, returning a recycling rate of 55%.The C&TD method allowed recycling...