23
Global
Height rank

The Exchange 106

Kuala Lumpur
Height
1
To Tip:
Height is measured from the level of the lowest, significant, open-air, pedestrian entrance to the highest point of the building, irrespective of material or function of the highest element (i.e., including antennae, flagpoles, signage and other functional-technical equipment).
445.5 m / 1,462 ft
2
Architectural:
Height is measured from the level of the lowest, significant, open-air, pedestrian entrance to the architectural top of the building, including spires, but not including antennae, signage, flag poles or other functional-technical equipment. This measurement is the most widely utilized and is employed to define the Council on Tall Buildings and Urban Habitat (CTBUH) rankings of the "World's Tallest Buildings."
445.5 m / 1,462 ft
3
Occupied:
Height is measured from the level of the lowest, significant, open-air, pedestrian entrance to the highest occupied floor within the building.
397.3 m / 1,303 ft
1 2 3 The Exchange 106
  Floors
Above Ground
The number of floors above ground should include the ground floor level and be the number of main floors above ground, including any significant mezzanine floors and major mechanical plant floors. Mechanical mezzanines should not be included if they have a significantly smaller floor area than the major floors below. Similarly, mechanical penthouses or plant rooms protruding above the general roof area should not be counted. Note: CTBUH floor counts may differ from published accounts, as it is common in some regions of the world for certain floor levels not to be included (e.g., the level 4, 14, 24, etc. in Hong Kong).
95
Below Ground
The number of floors below ground should include all major floors located below the ground floor level.
6
Height 445.5 m / 1,462 ft
Floors 95
Official Name
The current legal building name.

The Exchange 106

Other Names
Other names the building has commonly been known as, including former names, common informal names, local names, etc.

Signature Tower, TRX 106, TRX Signature Tower

Name of Complex
A complex is a group of buildings which are designed and built as pieces of a greater development.

Tun Razak Exchange

Type
CTBUH collects data on two major types of tall structures: 'Buildings' and 'Telecommunications / Observation Towers.' A 'Building' is a structure where at least 50% of the height is occupied by usable floor area. A 'Telecommunications / Observation Tower' is a structure where less than 50% of the structure's height is occupied by usable floor area. Only 'Buildings' are eligible for the CTBUH 'Tallest Buildings' lists.

Building

Status
Completed
Architecturally Topped Out
Structurally Topped Out
Under Construction
Proposed
On Hold
Never Completed
Vision
Competition Entry
Canceled
Proposed Renovation
Under Renovation
Renovated
Under Demolition
Demolished

Completed

Completion

2019

Country
The CTBUH follows the United Nations's definition of Country, and thus uses the lists and codes established by that organization.

Malaysia

City
The CTBUH follows the United Nations's definition of City, and thus uses the lists and codes established by that organization.

Kuala Lumpur

Function
A single-function tall building is defined as one where 85% or more of its usable floor area is dedicated to a single usage. Thus a building with 90% office floor area would be said to be an "office" building, irrespective of other minor functions it may also contain.

A mixed-use tall building contains two or more functions (or uses), where each of the functions occupy a significant proportion of the tower's total space. Support areas such as car parks and mechanical plant space do not constitute mixed-use functions. Functions are denoted on CTBUH "Tallest Building" lists in descending order, e.g., "hotel/office" indicates hotel function above office function.

Office

Structural Material
All-Steel
Both the main vertical/lateral structural elements and the floor spanning systems are constructed from steel. Note that a building of steel construction with a floor system of concrete planks or concrete slab on top of steel beams is still considered an “all-steel” structure as the concrete elements are not acting as the primary structure.

All-Concrete
Both the main vertical/lateral structural elements and the floor spanning systems are constructed from concrete which has been cast in place and utilizes steel reinforcement bars and/or steel reinforced concrete which has been precast as individual components and assembled together on-site.

All-Timber
Both the main vertical/lateral structural elements and the floor spanning systems are constructed from timber. An all-timber structure may include the use of localized non-timber connections between timber elements. Note that a building of timber construction with a floor system of concrete planks or concrete slab on top of timber beams is still considered an “all-timber” structure as the concrete elements are not acting as the primary structure.

Mixed-Structure
Utilizes distinct systems (e.g. all-steel, all-concrete, all-timber), one on top of the other. For example, a Steel Over Concrete indicates an all-steel structural system located on top of an all-concrete structural system, with the opposite true of Concrete Over Steel.

Composite
A combination of materials (e.g. steel, concrete, timber) are used together in the main structural elements. Examples include buildings which utilize: steel columns with a floor system of reinforced concrete beams; a steel frame system with a concrete core; concrete-encased steel columns; concrete-filled steel tubes; etc. Where known, the CTBUH database breaks out the materials used within a composite building’s primary structural elements.

Concrete-Steel Composite

Energy Label

GBI Gold

Height
Architectural
Height is measured from the level of the lowest, significant, open-air, pedestrian entrance to the architectural top of the building, including spires, but not including antennae, signage, flag poles or other functional-technical equipment. This measurement is the most widely utilized and is employed to define the Council on Tall Buildings and Urban Habitat (CTBUH) rankings of the "World's Tallest Buildings."

445.5 m / 1,462 ft

To Tip
Height is measured from the level of the lowest, significant, open-air, pedestrian entrance to the highest point of the building, irrespective of material or function of the highest element (i.e., including antennae, flagpoles, signage and other functional-technical equipment).
445.5 m / 1,462 ft
Occupied
Height is measured from the level of the lowest, significant, open-air, pedestrian entrance to the highest occupied floor within the building.
397.3 m / 1,303 ft
Floors Above Ground
The number of floors above ground should include the ground floor level and be the number of main floors above ground, including any significant mezzanine floors and major mechanical plant floors. Mechanical mezzanines should not be included if they have a significantly smaller floor area than the major floors below. Similarly, mechanical penthouses or plant rooms protruding above the general roof area should not be counted. Note: CTBUH floor counts may differ from published accounts, as it is common in some regions of the world for certain floor levels not to be included (e.g., the level 4, 14, 24, etc. in Hong Kong).

95

Floors Below Ground
The number of floors below ground should include all major floors located below the ground floor level.

6

# of Parking Spaces
Number of Parking Spaces refers to the total number of car parking spaces contained within a particular building.

2116

# of Elevators
Number of Elevators refers to the total number of elevator cars (not shafts) contained within a particular building (including public, private and freight elevators).

58

Top Elevator Speed
Top Elevator Speed refers to the top speed capable of being achieved by an elevator within a particular building, measured in meters per second.

6 m/s

Tower GFA
Tower GFA refers to the total gross floor area within the tower footprint, not including adjoining podiums, connected buildings or other towers within the development.

385,168 m² / 4,145,914 ft²

Rankings

#
23
Tallest in the World
#
18
Tallest in Asia
#
4
Tallest in Malaysia
#
4
Tallest in Kuala Lumpur

Construction Schedule

2015

Proposed

2016

Construction Start

2019

Completed

MEP Engineer
Design

The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.

Other Consultant

Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).

Landscape
Life Safety
Vertical Transportation
Wind
Material Supplier

Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).

Elevator
Façade Maintenance Equipment
Formwork
Owner/Developer
Mulia Group
Architect
Design

Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.

Mulia Group
Architect of Record

Usually takes on the balance of the architectural effort not executed by the "Design Architect," typically responsible for the construction documents, conforming to local codes, etc. May often be referred to as "Executive," "Associate," or "Local" Architect, however, for consistency CTBUH uses the term "Architect of Record" exclusively.

Peter Chan Architect
Structural Engineer
Design

The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.

Louie International
Engineer of Record

The Engineer of Record takes the balance of the engineering effort not executed by the “Design Engineer,” typically responsible for construction documents, conforming to local codes, etc.

EDP Consulting Group Sdn/Bdh
MEP Engineer
Design

The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.

Engineer of Record

The Engineer of Record takes the balance of the engineering effort not executed by the “Design Engineer,” typically responsible for construction documents, conforming to local codes, etc.

Primetech Engineers Sdn. Bhd.
Project Manager

The CTBUH lists a project manager when a specific firm has been commissioned to oversee this aspect of a tall building’s design/construction. When the project management efforts are handled by the developer, main contract, or architect, this field will be omitted.

Mulia Group
Other Consultant

Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).

Artist
Gallery Simon (Jooh Yun Kim); Massimo Del Chiaro
Energy Concept
Exergy
Geotechnical
Geo Optima, Inc
Landscape
SWA Group; INSITE Landscape Architects
Life Safety
Lighting
Sirius Lighting Office
Quantity Surveyor
PCM Kos Perunding Sdn. Bhd.
Sustainability
Exergy
Vertical Transportation
Way Finding
Landor Associates
Wind
Material Supplier

Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).

Aluminium
Euro Facade Tech
Ceiling
Linder GmbH; Armstrong Ceiling Solutions
Cladding
DDG Glass; Saint-Gobain Glass Facade
Concrete
Buildcon Concrete Sdn Bhd
Elevator
Façade Maintenance Equipment
Manntech; DEMAG
Fire Proofing
Isolatek International
Flooring
NS Bluescope Lysaght Malaysia Sdn Bhd
Formwork
Foundation Equipment
Sinohydro Corporation (Malaysia) Sdn Bhd
HVAC
Trane
Paint/Coating
Axalta Powder Coating Systems (Malaysia) Sdn Bhd; Jotun
Steel
China Construction Steel Structure Corporation

CTBUH Awards & Distinctions

Best Tall Building, by Height, 400 meters and above 2021 Award of Excellence

2021 CTBUH Awards

MEP Engineering Award 2021 Award of Excellence

2021 CTBUH Awards

 

Research

20 March 2020

Interactive Study on The Tallest 20 in 2020: Then and Now

CTBUH Research

This research paper undertakes a review of the 2012 report by the Council on Tall Buildings and Urban Habitat, “Tallest 20 in 2020: Entering the...

Global News

23 October 2019

New Kuala Lumpur Skyscraper Set to Open After Government Scrutiny

Malaysia’s next supertall building will be ready to take in tenants in December 2019, its developer said on October 23, 2019, as backers look to...

20 March 2020

Interactive Study on The Tallest 20 in 2020: Then and Now

CTBUH Research

This research paper undertakes a review of the 2012 report by the Council on Tall Buildings and Urban Habitat, “Tallest 20 in 2020: Entering the...

20 March 2020

Tall + Urban Innovation 2020: Dominant Trends

CTBUH Research

Providing a global overview of tall building development, design and construction, the CTBUH Awards Program and related Tall + Urban Innovation Conference annually survey projects,...

23 October 2019

New Kuala Lumpur Skyscraper Set to Open After Government Scrutiny

Malaysia’s next supertall building will be ready to take in tenants in December 2019, its developer said on October 23, 2019, as backers look to...

23 August 2019

Tower M, a 145-Story Skyscraper, is Planned for Kuala Lumpur

The Petronas Twin Towers, may lose its title as Malaysia’s tallest building(s), when The Exchange 106 and Menara PNB 118 are completed in Kuala Lumpur....