(W)rapper
Jefferson Towers
Building
Completed
2023
Office
All-Steel
Cal Green
73.6 m / 241 ft
16
2
499
6
2.5 m/s
16,773 m² / 180,543 ft²
Proposed
Construction Start
Completed
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).
Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).
You must be a CTBUH Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The Engineer of Record takes the balance of the engineering effort not executed by the “Design Engineer,” typically responsible for construction documents, conforming to local codes, etc.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The CTBUH lists a project manager when a specific firm has been commissioned to oversee this aspect of a tall building’s design/construction. When the project management efforts are handled by the developer, main contract, or architect, this field will be omitted.
The main contractor is the supervisory contractor of all construction work on a project, management of sub-contractors and vendors, etc. May be referred to as "Construction Manager," however, for consistency CTBUH uses the term "Main Contractor" exclusively.
Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).
Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).
2024 CTBUH Awards
17 March 2023
Hayden Tract, a former manufacturing hub in Culver City, California has been undergoing a transformation over the past four decades with buildings ideated by tech...
Located in a high seismic zone, this office building employs a unique structural system, resulting in a base-isolated structure where the structural steel remains essentially elastic or “non-yielding” in a Maximum Considered Earthquake (MCE) seismic event. The façade features an exoskeleton of arching steel bands, creating open, column-free interiors with unobstructed views, and a non-central core to maximize solar shading.
2024 CTBUH Awards
17 March 2023
Hayden Tract, a former manufacturing hub in Culver City, California has been undergoing a transformation over the past four decades with buildings ideated by tech...
20 August 2019
Three cranes are in full swing on the corner of Jefferson and La Cienega Boulevards, as construction goes vertical at the 11-acre (4.5-hectare) Cumulus site....
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.