You must be a CTBUH Member to view this resource.
The Canyon at Mission Rock
Mission Rock Building A, 1001-1049 3rd Street
Building
Completed
2023
Residential / Office
concrete
LEED ND Gold
80.8 m / 265 ft
23
1
283
7
34,900 m² / 375,660 ft²
Proposed
Construction Start
Completed
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
You must be a CTBUH Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
Usually takes on the balance of the architectural effort not executed by the "Design Architect," typically responsible for the construction documents, conforming to local codes, etc. May often be referred to as "Executive," "Associate," or "Local" Architect, however, for consistency CTBUH uses the term "Architect of Record" exclusively.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The main contractor is the supervisory contractor of all construction work on a project, management of sub-contractors and vendors, etc. May be referred to as "Construction Manager," however, for consistency CTBUH uses the term "Main Contractor" exclusively.
Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).
2024 CTBUH Awards
2024 CTBUH Awards
23 October 2019
A canyon-like tower by MVRDV and a twisting structure by Studio Gang are among the buildings to be revealed for a new San Francisco development....
This mixed-use residential complex features a five-story podium with shops, restaurants, offices, and a green rooftop terrace, that is topped by a 283-apartment high-rise. Characterized by its ruggedly textured red-brown façade, and a walkway that cuts diagonally through the building’s base, creating a landscaped public “canyon” that connects public and private spaces.
2024 CTBUH Awards
2024 CTBUH Awards
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.
View our privacy policy