You must be a CTBUH Member to view this resource.
JW Marriott Dallas Arts District
2000 Ross Avenue
Building
Completed
2023
Hotel
96 m / 315 ft
25
283
Construction Start
Completed
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
You must be a CTBUH Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The main contractor is the supervisory contractor of all construction work on a project, management of sub-contractors and vendors, etc. May be referred to as "Construction Manager," however, for consistency CTBUH uses the term "Main Contractor" exclusively.
03 December 2020
Developers are breaking ground next week, 7 December 2020, on a new downtown Dallas luxury hotel. Plano-based Sam Moon Group is building the 283-room JW...
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.
View our privacy policy