You must be a CTBUH Member to view this resource.
KPMG Centre
45 Clarence Street, HBOS Centre
Building
Completed
1992
Office
All-Concrete
4.5-STAR NABERS
127 m / 417 ft
30
169
32,100 m² / 345,522 ft²
You must be a CTBUH Member to view this resource.
You must be a CTBUH Member to view this resource.
Construction Start
Completed
You must be a CTBUH Member to view this resource.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.
View our privacy policy