You must be a CTBUH Member to view this resource.
La Clara
Building
Completed
2022
Residential
All-Concrete
82 m / 269 ft
24
83
Construction Start
Completed
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
You must be a CTBUH Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
31 May 2022
A South Florida flooring company employee died after she fell from the 13th floor of a high-rise condominium under construction in West Palm Beach, police...
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.
View our privacy policy