You must be a CTBUH Member to view this resource.
LCBO Tower at Sugar Wharf
Lower Yonge Precinct Phase One Office Tower, Sugar Wharf Tower A
Building
Completed
2021
Office / Retail
LEED Platinum targeted
117.8 m / 386 ft
25
You must be a CTBUH Member to view this resource.
Proposed
Construction Start
Completed
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
You must be a CTBUH Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
25 August 2020
Menkes Developments Ltd. ("Menkes"), with TD Asset Management Inc. (TDAM), is pleased to announce the completion of the exterior structure of its landmark office tower,...
Subscribe below to receive periodic updates from CTBUH on the latest Tall Building and Urban news and CTBUH initiatives, including our monthly newsletter. Fields with a red asterisk (*) next to them are required.
View our privacy policy