Le Pont Tower 5A & 5B
Hong Kong

Note: As this project is under construction, the data is based on the most reliable information currently available. This data is thus subject to change until the building has completed and all information can be confirmed and ratified by the CTBUH.

Height 66.58 m / 218 ft
Floors 20
Official Name

The current legal building name.

Le Pont Tower 5A & 5B
Name of Complex

A complex is a group of buildings which are designed and built as pieces of a greater development.

Type

CTBUH collects data on two major types of tall structures: 'Buildings' and 'Telecommunications / Observation Towers.' A 'Building' is a structure where at least 50% of the height is occupied by usable floor area. A 'Telecommunications / Observation Tower' is a structure where less than 50% of the structure's height is occupied by usable floor area. Only 'Buildings' are eligible for the CTBUH 'Tallest Buildings' lists.

Building
Status
Completed
Architecturally Topped Out
Structurally Topped Out
Under Construction
Proposed
On Hold
Never Completed
Vision
Competition Entry
Canceled
Proposed Renovation
Under Renovation
Renovated
Under Demolition
Demolished
Under Construction, 2020
Country

The CTBUH follows the United Nations's definition of Country, and thus uses the lists and codes established by that organization.

City

The CTBUH follows the United Nations's definition of City, and thus uses the lists and codes established by that organization.

Function

A single-function tall building is defined as one where 85% or more of its usable floor area is dedicated to a single usage. Thus a building with 90% office floor area would be said to be an "office" building, irrespective of other minor functions it may also contain.

A mixed-use tall building contains two or more functions (or uses), where each of the functions occupy a significant proportion of the tower's total space. Support areas such as car parks and mechanical plant space do not constitute mixed-use functions. Functions are denoted on CTBUH "Tallest Building" lists in descending order, e.g., "hotel/office" indicates hotel function above office function.

residential
BEAM Plus Provisional Gold
Official Website
Height

Height is measured from the level of the lowest, significant, open-air, pedestrian entrance to the architectural top of the building, including spires, but not including antennae, signage, flag poles or other functional-technical equipment. This measurement is the most widely utilized and is employed to define the Council on Tall Buildings and Urban Habitat (CTBUH) rankings of the "World's Tallest Buildings."

Architectural
66.58 m / 218 ft
To Tip
66.58 m / 218 ft
Occupied
60.52 m / 199 ft
Floors Above Ground

The number of floors above ground should include the ground floor level and be the number of main floors above ground, including any significant mezzanine floors and major mechanical plant floors. Mechanical mezzanines should not be included if they have a significantly smaller floor area than the major floors below. Similarly, mechanical penthouses or plant rooms protruding above the general roof area should not be counted. Note: CTBUH floor counts may differ from published accounts, as it is common in some regions of the world for certain floor levels not to be included (e.g., the level 4, 14, 24, etc. in Hong Kong).

20
Construction Schedule
2019

Construction Start

2020

Completed

Architect
MEP Engineer

Environmental

Quantity Surveyor

Elevator

Owner/Developer
China Vanke Co.,Ltd
Architect
Structural Engineer
CM Wong & Associates Limited
MEP Engineer
Contractor
China Overseas Building Construction Ltd.

Civil

CM Wong & Associates Limited

Environmental

Interiors

FDAT

Landscape

Shma Company Limited

Lighting

Spectrum Design and Associates (Asia)

Quantity Surveyor

Elevator